Skip to main content

NEXOCON

Quantity Surveying & Cost Consulting

Precision cost management, from concept to closeout.

Independent, certified quantity surveying services trusted by developers, owners, and financial institutions across British Columbia. We bring financial clarity to every phase of your project.

ELEMENTAL COST PLANEvery element measured and priced.Mixed-use · 10 storeys · GFA 76,180 sq ftA1SubstructureExcavation, shoring, foundations$3,999,4509.9%$52.50 per sq ftA2StructureFrame, slabs, core walls$5,987,74814.9%$78.60 per sq ftA3Exterior enclosureWalls, windows, roofing$4,829,81212.0%$63.40 per sq ftBInteriorsPartitions, finishes, fittings$5,850,62414.6%$76.80 per sq ftCServicesMechanical, electrical, elevators$9,674,86024.1%$127.00 per sq ftDLandscaping & civil workPlanting, paving, site services$1,561,6903.9%$20.50 per sq ftSHARE OF THE BUDGETZ1 General requirements & fee 9.9%Z2 Contingency & escalation 10.7%CONSTRUCTION BUDGET$40,200,000$527.70 per sq ft of GFA
Scroll to take the building apart
Our Approach

Certified cost advice, at every stage.

Every NEXOCON budget, review and report is prepared by a certified team that also builds, so the numbers reflect how work is priced, sequenced and installed in British Columbia.

Across the NEXOCON team, 22 years in development and construction, and more than $200M in value delivered.

Qualified & Certified

  • Bachelor of Technology, Construction Management

  • Professional Gold Seal Certified Project Manager

  • Professional Quantity Surveyor

  • Project Management Professional

  • Licensed Residential Builder, BC Housing

What We Offer

Cost services for every stage of the project.

From early-stage feasibility to final account, our certified team provides the cost intelligence you need to make confident decisions.

  1. SUBSTRUCTURESTRUCTUREENVELOPEINTERIORSSERVICESSITE + GCBUDGETESTIMATE CLASSDCBA

    Construction cost estimates at every phase, from concept budget to detailed elemental cost plan, benchmarked against current BC pricing.

  2. ABSAME SCOPEABSAVINGSAME QUALITY, LOWER COST

    Alternative materials, methods and specifications, priced, so the budget improves without giving up quality or scope.

  3. GENERAL CONDITIONSGC 1.1GC 2.4GC 3.2GC 5.1GC 6.5GC 6.6GC 9.2GC 12.1COSTRISKREVIEWED

    Tender documents, contract terms and procurement strategy reviewed for cost risk, so the contract reflects the true scope of work.

  4. TRADEBID ABID BBID CCONCRETEFRAMINGENVELOPEMECHANICALELECTRICALGENERAL REQ.EXCL.+ PRICEDEXCL.+ PRICEDEXCL.+ PRICEDTOTALAS BIDLEVELLEDBEST VALUE

    Contractor bids compared for completeness, accuracy and value, so the contract is awarded with confidence.

  5. PROJECT BUDGETHARD COSTSSOFT COSTSFINANCINGLANDCONTINGENCYTOTALLOWHIGHCONTINGENCYTESTED AGAINST RISKLENDER

    The budget and its documentation reviewed before a construction loan closes, with the contingency tested against the project's risk.

  6. DRAW 07WORK COMPLETELOAN DRAWN82%77%FUNDS COVERCOST TO COMPLETE

    Progress draws reviewed for lenders, with cost to complete measured against the undrawn loan balance.

  7. 123AB7CHANGE ORDER 07CLAIMEDAPPROVEDENTITLEMENT CHECKED

    Change orders and contractor claims reviewed for entitlement, scope and price, so changes are approved on a fair, documented basis.

  8. 100500MONTHLY CLAIMS, CERTIFIED% OF CONTRACTCONTRACT SUM + APPROVED CHANGE ORDERSFINAL ACCOUNT100% CERTIFIED

    Progress claims and variations certified and the final account prepared, so every payment is documented and defensible.

Our Reporting

If every cost report looks the same, there's a reason.

Many cost reports follow the consultant's workflow rather than the reader's decisions. Lenders and developers need clear answers they can act on, without searching for them.

Our reporting framework is proprietary and built around the decisions you have to make. Every report answers three questions:

  1. 01What is the forecast final cost?
  2. 02How much contingency remains?
  3. 03Which decisions are due, and by when?
A4321SUMMARYThe answersUNDERNEATHThe evidenceSite photos, cost byelement, change log01FINAL COST02CONTINGENCY03DECISIONS
DRAW REVIEW No. 12SITE VISIT · OCTOBER 2026STRUCTURE 82%ENCLOSURE 48%01SITE REVIEWProgress measured on site,element by element02THIS DRAWWork done this periodRequested$1,360,000Supported$1,253,50503LOAN BALANCEWORK IN PLACE 47%BUDGET $40,200,000COST TO COMPLETE$21.2MFUNDS SUFFICIENTThe remaining loan coversthe cost to complete04REPORT TO THE LENDERDraw 12, substantiated bysite evidence and cost recordsRECOMMENDED FOR RELEASE$1,253,505
For Lenders

Know where the loan stands before each draw is released.

We work for banks, credit unions and private lenders on residential and commercial construction loans. Before each draw is released, we run four checks.

  1. 01
    Site review

    Work in place is measured on site, element by element.

  2. 02
    Draw review

    The amount requested is tested against the value of work in place.

  3. 03
    Loan balance

    Cost to complete is tested against the undrawn loan.

  4. 04
    Report to the lender

    Each substantiated draw comes with a recommendation and the evidence behind it.

We also review budgets before a loan closes, and escalate risks as soon as they appear.

The NEXOCON Difference

Independent cost advice, grounded in construction.

  1. 01
    Priced with site experience.

    Our team also builds, so every quantity and rate reflects how the work is sequenced, installed and inspected in British Columbia.

  2. 02
    Current market pricing.

    Our knowledge of BC construction costs comes from active project experience, not outdated benchmarks.

  3. 03
    Reports written for the reader.

    Findings are organized around the decision the client has to make, from the first budget to the final account.

Independence & integrity

Our reports state the numbers as we find them, whoever commissioned the work. We disclose any interest in a project before we accept an appointment, and we do not review or certify work on a project we are building.

Explore Construction
01HOW IT IS BUILTIn sequence, from the formwork up02HOW IT IS PRICEDPer sq ft, indicative Q4 20265Finish and cure$1.904Concrete and placing$8.703Sleeves and embeds$1.302Reinforcing steel$6.101Formwork and shoring$16.80Crane, supervision and feeCarried in general requirements8 IN. FLAT PLATE, PER SQ FT$34.8003IN THE REPORTTypical floor: 6,684 sq ft × $34.80$232,603
Get in Touch

Put certified cost advice behind your next decision.

Wherever your project stands, we're ready to help.

Disclaimer

All figures, illustrations, drawings, examples and work methods on this page are for demonstration only. They do not represent any client project and are not professional advice. No reliance may be placed on them, and no part of them may be copied, reproduced or used for any purpose without NEXOCON's written consent. NEXOCON's reporting methodology is confidential and is discussed only with prospective clients.